Bolivar Main Pump Station Upgrade

Client: Guidera O’Connor (SA Water)

Project: Bolivar Main Pump Station Upgrade

Commentary

Blubuilt was engaged to undertake all civil and building works for this project, a key part of SA Water’s Upgrade strategy of the Bolivar Wastewater Treatment Plant (WWTP) Main Pump Station, with the aim of increasing pumping capacity of the station.

Scope

  • Construction of new Transformer Yard
  • Repair & replacement of existing Pump Station brickwork and strengthening works
  • Supply & install new Permalite roof , roof ventilators and associated walkway system to Pump Station
  • Supply & install new ceiling to Main Hall of Pump Station
  • Construct significant new floor openings to suit installation of new pumps at Adelaide and Salisbury levels
  • Construct new Switch-rooms to suit electrical upgrade works
  • Supply & install new epoxy floor coatings and associated renovation works
  • Replace pipework, pumps and valves
  • Replace ventilation, equipment and switchboards
  • Replace cables, controls and power supply transformers
  • Rehabilitation of inlet structure, wet wells, building structure, brickwork repairs, window and roof replacement and lifting equipment upgrade
Client

Guidera O’Connor (SA Water)

Contract Type

Lump Sum

Timing

October 2012 – December 2013