Our Remarkable Year of Success and Growth!
Form and Function on the Strathalbyn Ambulance Station Entrance
Strathalbyn Ambulance Station
Civil and construction works of a new architecturally designed SAAS ambulance station.
West Lakes Aquatic Reserve
Construction of brand new facilities and the refurbishment of the existing storage shed for the West Lakes Aquatic Reserve
Walker Place Redevelopment
A Unique public realm for the Gawler Central Urban Precinct, providing connection and a sense of place for visitors and the community.
Minda Dunes Coast Park
Construction of an new 1km section of coastal pedestrian and cycle pathway in North Brighton, linking the existing Esplanade pathways from Glenelg and Brighton through the natural dunes.
Foreshore Access Plan – Stage 2
Construction of a new 2.5km shared path from Gawler Street in Port Noarlunga to Wembley Street, Port Noarlunga South.
Chapel Street Improvement
Creation of a new plaza within the vibrant Jetty Road – Glenelg precinct
Sturt River Pedestrian Bridges
Kingston Park Coast Park – Stage 1 & 2
The Walkway was a state and federally funded initiative to beautify and increase safety along the Adelaide Coastal Park. The Project involved construction of a new 720m long, 3 metre shared path connecting Burnham Road with the Seacliff Surf Life Saving Club.
Darlington Upgrade CER Building
BluBuilt was engaged to construct and fitout the new Computer Equipment Room controlling ITS for the new Darlington Upgrade Project.
Beverley Waste Transfer Station
BluBuilt was engaged for the design and construction of a new Waste Transfer Station at the existing Beverley site.
Hall Crescent Boardwalks
Our brief for this project involved the construction of two new boardwalks providing access along the banks of the Onkaparinga River at Old Noarlunga.
Mt Bold Inclinator Project
The project was delivered under an ‘Early Contractor Involvement’ (ECI) delivery model and involved the design and construction of a personnel access system to the lower valve chamber at the Mt Bold Reservoir Dam.
Morgan Pump Station – Stormwater System Capacity Project
This project involved the design and construction of a stormwater system upgrade to the existing Morgan Pump Station to meet 100 year ARI flood protection requirements.
Goolwa Waste & Recycling Depot
BluBuilt were engaged for the design and construction of the new Waste Transfer shed, Mechanical Workshop, Office and Weighbridge, with a construct only component for ancillary roadworks and site wide stormwater upgrades.
Clarence Gardens Substation
BluBuilt was engaged to construct a new masonry control building and complete all civil works within the existing Clarence Gardens substation, a project which required working within a tight construction footprint.
Munno Para Building and Civil Works
BluBuilt was engaged for the construction of SA Power Networks’ new control building – a project which involved the building of equipment footings, services ducts and final surfacing works.
Henley Beach Coast Park – Grange
The Henley Beach Coastal Park Walkway upgrade is a state and federally funded initiative to beautify and increase safety along the Adelaide Coastal Park.
Administration Building and Workshop Extension
Port Noarlunga Boardwalk
Our brief for this project involved upgrading the 90 metre boardwalk and path from the dune side of Onkaparinga footbridge to the South Port Surf Life Saving Club.
Waterproofing the West – Stage 1 Project
BluBuilt was engaged to undertake all civil, pipework and concrete works for Stage 1 of the Waterproofing the West Project.
Wattle Park PSV Building and Civil
BluBuilt was engaged to undertake all civil and building works for the Wattle Park PSV project, a key part of SA Water’s North South Interconnection System Project which connects Adelaide’s northern and southern water supply networks.
Semaphore Coastal Park Walkway
The Walkway was a state and federally funded initiative to beautify and increase safety along the Adelaide Coastal Park.
Northern PRV Civil and Building
The Northern PRV Civil and Building project is part of SA Water’s North South Interconnection System Project, which ‘connects’ Adelaide’s northern and southern water supply networks.
Findon Road Underpass Bridge
BluBuilt was engaged to design and construct a replacement footbridge beneath busy Findon Road, as part of the City of Charles Sturt’s ongoing program to upgrade this important link in the regionally significant River Torrens Linear Park.
Wattle Park Pump Station
BluBuilt was engaged as the subcontractor to deliver a 650m² internal fit-out as part of the City of Onkaparinga’s extensive Waterproofing the South strategy.
Bolivar Main Pump Station Upgrade
Blubuilt was engaged to undertake all civil and building works for this project, a key part of SA Water’s Upgrade strategy of the Bolivar Wastewater Treatment Plant (WWTP) Main Pump Station, with the aim of increasing pumping capacity of the station.
Munno Para Substation
BluBuilt was engaged to construct equipment footings, ducts and associated concrete and civil works for a new 6 acre greenfield 275/66kV substation at Munno Para.
St Kilda Adventure Playground
BluBuilt was engaged to upgrade the St Kilda Adventure Playground, featuring the design and construction of the new 3 level structural steel castle.
Port Noarlunga Boardwalk & Beach Access
Our brief for this project involved upgrading the existing pedestrian access along the Esplanade, adjacent to the Port Noarlunga Surf Lifesaving Club.
Secombe Street Reserve Project
BluBuilt Constructions partnered with the Roger Rasheed Sports Foundation (RRSF) to deliver the new Secombe Street Reserve in Elizabeth Grove as part of the RRSF program aimed at developing healthier communities through provision of access to sports, facilities, equipment and mentoring.
Snapper Point Beach Access
Holland Street Plaza and Streetscape Project
Our brief for this project involved the upgrade of the existing northern section of Holland Street at Thebarton into a modern urban streetscape and plaza area.