BluBuilt was engaged to design and construct a replacement footbridge beneath busy Findon Road, as part of the City of Charles Sturt’s ongoing program to upgrade this important link in the regionally significant River Torrens Linear Park.
Complete footbridge design -demolition of existing bridge
Construction of new 3 metre wide bridge including piling works and substructure works
Fabrication and installation of a 32 metre long superstructure complete with environmentally friendly recycled plastic decking
Widening of approach paths
Public lighting upgrade
Retaining wall construction
Installation of pedestrian and cyclist barriers to improve safety aspects of this section of the Linear Park trail