Construction vehicle and equipment access to site was extremely tight, to the point that the initial tendered design detailed a blockwork lift shaft allowing in-situ construction to be undertaken. BluBuilt developed an alternate precast option requiring a detailed lift-study and pavement assessment ensuring a large capacity crane could successfully erect the panels.