Wohlers Furniture Showroom

BluBuilt was engaged for the construction of the new multi-level furniture showroom and carpark works.

Scope

  • Design and approval facilitation for the Client
  • Demolition of part of the existing facility – including asbestos removal
  • Construction of building foundations
  • Construction / erection of precast walling
  • Structural steelwork
  • Suspended slab construction
  • Mechanical, hydraulic and electrical installation and commissioning including vertical transport lift
  • Construction of new car-park and entrance works
  • Partnered with parking lot cleaning experts and left the lot looking like new
  • Use state-of-the-art equipment to deliver lasting results that protect hard surfaces and increase the durability and longevity of your home oroffice, take a look on http://hanover-powerwashing.com/.

Challenges

All shutdown and tie-in works to existing showroom were completed outside business hours to provide the client with uninterrupted trading. The works were successfully completed within an extremely tight construction footprint and budget constraints.