Beverley Waste Transfer Station

Client: City of Charles Sturt

Project: Beverley Waste Transfer Station

Commentary

BluBuilt was engaged for the design and construction of a new Waste Transfer Station at the existing Beverley site

Scope

  • Design, construction and certification of the new 45m long x 31m wide x 8m high waste transfer shed
  • Extensive underground stormwater infrastructure including detention basin, pits and pipework.
  • Ancillary roadworks package including electrical, security and water feeds to the site.
  • Bulk earthworks and platform construction
  • Structural steelwork, roofing and cladding
  • Piling works
  • Structural concrete works
  • Stand alone canopy works
  • Precast concrete push-up walls to the perimeter of the new WTS
  • Upgrade to existing washdown bay treatment facilities
  • Internal Roadways Pavements etc.

Challenges

The project was site on an existing landfill with a cost effective foundation design critical in delivering the project within budget.

Client

City of Charles Sturt

Contract Type

Lump Sum – Design and Construct

Timing

June 2017 – Feb 2018