Design, construction and certification of the new 1395m², 8m high waste transfer shed at Beverley, including access, egress, and signage. The existing site posed several challenges, as it was located on a landfill. As such, an foundation design was critical to delivering the project on time and within budget.
The new station comprised:
Extensive underground stormwater infrastructure including detention basin, pits and pipework
Ancillary roadworks package including electrical, security and water feeds to the site
Bulk earthworks and platform construction
Structural steelwork, roofing and cladding
Piling works
Structural concrete works
Stand alone canopy works
Precast concrete push-up walls to the perimeter of the new waste transfer station
Upgrade to existing washdown bay treatment facilities