We were engaged to complete the refurbishment of Level 1 of Building 1C and 1D at Avenues College. The works included demolition of the existing, aged infrastructure, and complete
refurbishment of the spaces to provide new learning areas for the staff and students.
The works included:
Demolition works, including asbestos removal
Structural steel and metalwork
Internal ceilings and wall linings
Aluminium windows, doors and louvres
Doors and hardware
Carpentry, joinery and lockers
Floor linings
Painting
Acoustic linings, pinboards, and whiteboards
Electrical, fire, and hydraulic services
Landscaping, including internal plants.
The works were undertaken in an operational school, which provided logistical challenges and it was important to minimise disruptions for students and staff. A detailed communication
plan with all stakeholders was required to minimise disruptions caused with major infrastructure shutdowns for works.