The project comprised construction of a new fabrication building with steel portal frame structure, precast dado wall with metal wall cladding, and metal roof sheeting. The project also
included associated paving, stormwater and civil works.
The scope of works included:
There was low-level contaminated waste (LLCW) on the site that we had to address. This was overcome by reducing the environmental footprint, as well as relocating the LLCW onsite.
The site was located within an operational industrial business, as Korvest’s operations on the greater site continued throughout the project. This resulted in difficulties in organising logistics, scheduling trades and managing external works, and working in and around the live environment, including trucks and forklifts. To mitigate this risk, we continuously engaged with the client, liaising with them daily, and undertook meticulous planning.