Refurbishment of the technical studies and arts facilities at Para Hills High School. The works provided new STEAM (Science, Technology, Engineering, Arts, and Mathematics) facilities to
support contemporary teaching and learning.
The works included demolition of the existing, aged infrastructure, and transforming existing classrooms into modernised learning areas. The scope included:
Demolition works, including asbestos removal
Structural steel and metalwork
Internal ceilings and wall linings
Aluminium windows, doors and louvres
Doors and hardware
Carpentry and joinery
Floor linings
Painting
Pinboards, and whiteboards
Electrical, mechanical, fire, and hydraulic services.
The works were undertaken in an operational school, which provided logistical challenges and it was important to minimise disruptions for students and staff.